Home › Ask Buckets › How to Stretch a Shur-Loc E-Z Frame (Step by Step)
BI
Buckets of InkSpecs from published maker data · Tempe, AZ
Short answerPlace the frame under the safety bar, connectors fully engaged, pull both long sides to hook 2, then both short sides to hook 2, then long sides to hook 3 and short sides to hook 3. Always tension the long bars first.
Steps
- Make sure the connectors are fully engaged.
- Place the frame under the safety bar.
- 1st stage: pull both long sides to the 2nd hook, then both short sides to the 2nd hook.
- 2nd stage: pull both long sides to the 3rd hook, then both short sides to the 3rd hook.
Frequently asked questions
Which sides do you tension first?
The long sides, in both stretching stages.
What torque do E-Z frame corner bolts take?
Torque the bolts to 20 ft. lbs after assembling the corners (Shur-Loc how-to).
Related: Ask Buckets
Have a question for our shop? Call or text
480-229-7806 (Monday to Friday, 7:30 AM to 4:00 PM Arizona time) or
send us a message. Want to see a machine run? Visit our demo room in Tempe, AZ during the same hours. In-stock orders placed by 2:30 PM Arizona time ship the same day from Tempe, AZ. Need equipment?
Get a quote.
We Bring the Store to Your Door. ← More straight answers from our Tempe shop